Phase 2 Extension

Tapovan Circle Metro Station

GMRC Standard Station 1 Line(s)

Station Hours

General Operating Schedule

First Train

06:29

Last Train

22:09

Tapovan Circle Train Schedule

Train frequency and operating hours per line.

Phase 2 Extension

Motera Stadium ↔ Sector 1

← Previous Station

Vishwakarma College

Next Station →

Narmada Canal

Platform Guide

Phase 2 Extension

Platform 1

Towards

Sector 1

Platform 2

Towards

Motera Stadium

Facilities at Tapovan Circle

On-station amenities and accessibility features.

WiFi
Parking
Lift
Elevator
ATM
Food Court
Retail
Washroom

Exit Gates

Station exits and nearest landmarks to each gate.

A

Tapovan Circle

Gate A Exit

B

Zundal

Gate B Exit

C

Chandkheda

Gate C Exit

Nearby Tapovan Circle

Key landmarks, transport hubs, and places of interest within walking distance.

Area

  • Tapovan Circle
  • Zundal
  • Chandkheda

Connect from Tapovan Circle

Direct routes to major hubs and end-of-line terminals.

Major Interchanges

Terminals / End of Line

Tapovan Circle FAQs

The first train at Tapovan Circle departs at 06:29 and the last train runs at 22:09. Timings may slightly vary on weekends and public holidays.
No, Tapovan Circle is not an interchange station. It serves the Phase 2 Extension.
Dedicated parking is not listed for Tapovan Circle. Street parking may be available nearby.
Tapovan Circle is served by the Phase 2 Extension.
During peak hours (8:00 AM–12:00 PM and 5:00 PM–9:00 PM), trains run approximately every 2 min 30 sec. During off-peak hours, frequency is around 4 min 00 sec.