Phase 2 Extension

Tapovan Circle Metro Station

GMRC Standard Station 1 Line(s)

Station Hours

General Operating Schedule

First Train

06:29

Last Train

22:09

Tapovan Circle Metro Station Train Schedule

Train frequency and operating hours per line.

Phase 2 Extension

Motera Stadium ↔ Sector 1

← Previous Station

Vishwakarma College

Next Station →

Narmada Canal

Tapovan Circle Metro Station Platform Guide

Phase 2 Extension

Platform 1

Towards

Sector 1

Platform 2

Towards

Motera Stadium

Facilities at Tapovan Circle Metro Station

On-station amenities and accessibility features.

WiFi
Parking
Lift
Elevator
ATM
Food Court
Retail
Washroom

Tapovan Circle Metro Station Entry And Exit Gates

Station entry and exit points with nearest landmarks to each gate.

A

Tapovan Circle

Gate A Exit

B

Zundal

Gate B Exit

C

Chandkheda

Gate C Exit

Nearby Tapovan Circle Metro Station

Key landmarks, transport hubs, and places of interest within walking distance.

Area

  • Tapovan Circle
  • Zundal
  • Chandkheda

Connect from Tapovan Circle Metro Station

Direct routes to major hubs and end-of-line terminals.

Major Interchanges

Terminals / End of Line

Tapovan Circle Metro Station FAQs

The first train at Tapovan Circle departs at 06:29 and the last train runs at 22:09. Timings may slightly vary on weekends and public holidays.
No, Tapovan Circle is not an interchange station. It serves the Phase 2 Extension.
Dedicated parking is not listed for Tapovan Circle. Street parking may be available nearby.
Tapovan Circle is served by the Phase 2 Extension.
During peak hours (8:00 AM–12:00 PM and 5:00 PM–9:00 PM), trains run approximately every 2 min 30 sec. During off-peak hours, frequency is around 4 min 00 sec.